Prerequisite is divisional approval. Reviews materials which are normally associated with the Wastewater Treatment Plant Operator's Class IV or Class III level certification examinations. Utilizes lecture, audiovisual, and workshop sessions to review required materials and to prepare the trainee to complete the wastewater operator examinations. Lecture 1 hour. Laboratory 2 hours. Total 3 hours per week.